Quality starts with the drawing.
Agree the important dimensions, surfaces and checks before sampling and production.

Build the inspection plan together
Before tooling
Control drawing revisions, review DFM, identify critical dimensions and agree the material and acceptance requirements.

During sampling
Review trial parts, dimensions and cosmetic results. Document corrections and the conditions for approval.

During production
Use the agreed material, setup and inspection plan. Confirm traceability, packaging and reporting requirements for the order.

Equipment is matched to the project
| Injection molding | The published list includes Haitian 120, 160, 200, 280, 380 and 600 T classes and a Donghua 1250 T machine. |
|---|---|
| Mold manufacture | The public equipment list includes CNC machining centers, EDM and wire-cutting capabilities. |
| Measurement | The source videos show coordinate measurement and quality inspection processes. |
| Project confirmation | Actual availability, machine interface, shot capacity and mold fit are reviewed before quotation. |
Equipment information is drawn from the public company list and is subject to confirmation. The source describes an ISO 9001:2015 quality-management framework; current certificate validity and scope require document verification.
Watch inspection in practice
Quality inspection process
Source video on aaamould.netTell us what you’re making.
Send the part, material and annual volume. We will review the drawing requirements with you.
